CAM-236
A pedestrian jumps back at the crossing
Mid-morning at the engine-aisle crossing. An AGV loaded with engine blocks comes in from the left. A forklift carrying a parts cage crosses from the right, the driver looking straight ahead. In between, on the crossing painted on the floor, an operator in a yellow vest jumps back with his hands out in front. Nobody falls and nobody is going to write this down anywhere. IRIS sees the three paths at once.

Turn on IRIS Vision
AI-generated image
What IRIS understands
What it recognises in this scene
- pedestrian jumping back
- forklift with a parts cage
- AGV loaded with engine blocks
- pedestrian crossing painted on the floor
- green pedestrian lane
What this camera measures
An alert says something is happening. The reading says how much.
- 1People at the crossing
- 2Vehicles at the crossing
- 1,2 mClosest distance measured
- 46Crossings counted in an hour
- 10:07Time of the alert
The figures on this screen are an example from the illustration, not any client's measurement.
The rule
You decide once. IRIS applies it always.
If
a person and a vehicle meet at the crossing closer than the distance the plant has set
Then
- alert the safety manager with the camera and the time
- save the video of the ten seconds before and the ten after
- add the incident to this crossing’s tally of encounters
The instruction that set it up«Tell me when a person and a vehicle meet at the crossing, and save me the video.»
What changes
What changes for whoever answers for the plant
A near miss leaves no report. Nobody is hurt, nothing is damaged and the shift carries on. That is why a crossing where it happens fifteen times a month looks as safe as one where it never happens. With the camera, every scare is recorded with its time, its video and its crossing. After a month you can see which corner collects the encounters, and that is fixed with a mirror, a barrier or a change of route.
What people usually ask
Does IRIS stop the AGV or the forklift?
No. IRIS drives nothing and brakes nothing. The AGV has its own sensors and the forklift has a person on it. What IRIS does is see the encounter from above, give the alert while it is happening and save the twenty seconds that explain it. With that the safety manager can go to the crossing and change something, instead of finding out on the day of the accident.
How does IRIS measure the distance between the person and the vehicle?
Against the floor. The aisle has lines, zebra stripes and slab joints at known distances, and the view is calibrated once against those references. From then on the distance is read off those marks. If the floor has no references, the plant paints some, or the rule is set to paths crossing at all, with no metres involved.
What is the point of counting near misses?
It lets you fix the crossing before the accident. One encounter is bad luck; fifteen a month at the same corner is a problem with how the aisle is laid out. IRIS leaves every encounter with its time and its video, so at the end of the month you have a list instead of a feeling. Asking is for finding, counting is for measuring: here you need both.
Other cameras
Every simulation
Emergency gear blocked
Tell me if something blocks an exit, an emergency shower or a fire lane, or if the equipment is not where it belongs.
- The sentence
- Where it applies
- What it finds
- The same rule
Next step
The motorway
Who watches an entire motorway?
10 cases: 8 raise an alert when something happens and 2 only measure. You see each image as it is, and then with what IRIS understands on top.
Public transport
Who watches a whole station at rush hour?
17 cases: 11 raise an alert when something happens and 6 only measure. You see each image as it is, and then with what IRIS understands on top.
And the best part
You decide once what matters to you.It stops depending on who happens to be on shift.
You say it in your own words and it stays written down. Nobody has to remember anything at the start of a shift: what you decided is already in place, and still there tomorrow.
Tell us your problem and we will say whether IRIS understands it, or not yet.
We reply the same working day.