CAM-242

A mountain of parts has built up in front of one machine

Afternoon shift in the machining shop. The curved conveyor feeding the machine is packed to the brim with metal casings, stacked and skewed, one on top of another. The signal tower is green: the machine is working, but it can’t keep up. A few feet further on, the roller conveyor that carries the output away is empty end to end. Two operators look at the line. IRIS counts the parts waiting and the parts coming out.

Afternoon shift in the machining shop. The curved conveyor feeding the machine is packed to the brim with metal casings, stacked and skewed, one on top of another. The signal tower is green: the machine is working, but it can’t keep up. A few feet further on, the roller conveyor that carries the output away is empty end to end. Two operators look at the line. IRIS counts the parts waiting and the parts coming out.
CAM-242IRIS VisionLive

Turn on IRIS Vision

AI-generated image

CAM-242 · MACHINING CELL · WIP BUILD-UP

What IRIS understands

What it recognizes in this scene

  • parts piling up in front of the machine
  • the machine that sets the pace
  • output conveyor running empty
  • operator watching the line grow
  • operator at the next station with nothing to do

What this camera measures

An alert says something’s happening. The reading says how much.

  • 58Parts waiting in front of the machine
  • +19Parts added to the line in twenty minutes
  • 2Parts on the output conveyor
  • 14 minHow long the line has been growing
  • 5People in frame

The figures on this screen are an example from the illustration, not any client’s measurement.

The rule

You decide once. IRIS applies it always.

If

the line in front of the machine goes over forty parts for more than ten minutes

Then

  1. alert the store supervisor with the camera and the size of the line
  2. show at the same time how many parts leave on the next conveyor
  3. save the queue curve hour by hour for the whole shift
The instruction that set it up«Count how many parts are waiting in front of this machine and warn me if it goes over forty for more than ten minutes.»

What changes

What changes for whoever answers for the plant

A bottleneck is always found too late, when half the store is standing around waiting. With the camera you see it earlier: the line grows in front of one machine while the conveyor downstream empties at the same time. Those two figures — how many parts wait here, how many pass there — say which station is the problem without walking the store. The supervisor moves people and material with the picture in front of him.

What people usually ask

How does IRIS know there’s a bottleneck?

By counting. IRIS counts the parts waiting in front of the machine and the parts leaving on the next conveyor. When one figure goes up while the other goes down, that’s the bottleneck. No new sensor is needed on the machine: the count is done on the picture, by drawing the zone being watched and the line things cross.

Does it predict when the line will build up?

No. IRIS doesn’t predict: it reports what’s happening while it happens. It sees that the line has grown from twenty to fifty parts in twenty minutes and says so right away. That’s early enough to act before the next station runs out of work, but the forecast and the decision belong to a person.

Does it replace the system that already runs production?

No. The production system knows how many parts each machine has declared. What it doesn’t know is how many are on the floor, on a conveyor or in a bin waiting their turn. IRIS counts what can be seen and puts that figure next to the one that already exists. It’s the material nobody has declared yet, and it usually explains the delay.

Simulation · how IRIS works

Everything comes in. Only what matters gets through.

This sums up what IRIS does with one alert, from the moment it appears until it’s closed. The real screen holds far more; this is the main thread.

  1. Cameras on the map
  2. You draw an area
  3. What passed shows up
IRIS NEURAL
30ES
IRISDirectoGrabacionesGISIncidencias3996SituaciónCasosLPRAutomatizacionesIRIS DATA
Ask a question or make a request…Send
IRIS · Infinity Neural

And the best part

You decide the rule onceand it’s applied the same way every time.

At three in the morning it means what it means at noon, on camera one and on camera four thousand. It doesn’t depend on who’s on shift, or how tired they are.

Tell us your problem and we’ll say whether IRIS understands it, or not yet.

A person answers, the same working day.